07 4602 0531

Good questions

Frequently asked, clearly answered.

A practical guide to design fees, timing, approvals and the reports involved in getting a project ready to build.

01Are you architects?

Building designers are similar, but not the same. In Queensland, a licensed building designer can undertake residential, commercial and unit development work. Lockhart is licensed through the Queensland Building & Construction Commission.

02How much will my plans cost?

Lockhart provides a no-obligation quote for each project. Initial new-home meetings are $275 + GST. Renovation and extension site meetings generally range from $330 to $440 + GST, with travel added outside Toowoomba.

03How long will it take to receive my plans?

Concept or preliminary plans are generally supplied within 15–20 business days. More complex projects can vary, and your building designer will confirm timing when you accept the quote.

04Will my plans comply with legislation?

Yes. The building-design team stays current with the national, state and local government requirements that affect each project.

05What if I am not happy with the plans?

The design is refined with you. If the first concept does not meet the brief, the team works through revisions to achieve the right outcome.

06Can you provide 3D images?

Yes. Lockhart can provide 3D renders and online walkthroughs so you can understand the proposed design before it is built.

07How long does building approval take?

Once all supporting documentation is available, approval generally takes up to four weeks. Town planning or additional council applications can extend that timeframe.

08Do I need to build straight away?

No. Your decision notice will state how long the approval remains current, commonly between 12 and 24 months.

09Can you recommend builders?

Yes. Lockhart works with a trusted range of small and medium local builders and can suggest a team suited to your project.

10What is an energy report?

An energy-efficiency assessment is required for building approval. A certified assessor uses the home design to establish heating and cooling demand and demonstrate compliance with the National Construction Code.

11What is a bushfire report?

Properties identified in a bushfire overlay may require a hazard assessment and BAL rating. Lockhart can recommend a local bushfire assessor.

12Why do I need a soil test?

A soil test gives the structural engineer the information needed to design footings and foundations. Tests are generally considered current for about two years.

13Why do I need a contour survey?

A contour or topographical survey records the levels and constraints of the land so the designer and builder can plan and cost the project accurately.

14Do I need engineering?

Yes. Your building designer develops the home and its timber structural requirements; engineers design slabs, footings, steelwork and specialist bracing.

Have a question that is not covered here?

Contact the team